Masonry Restoration Past and Present Massachusetts Projects

This is a placeholder for the Yext Knolwedge Tags. This message will not appear on the live site, but only within the editor. The Yext Knowledge Tags are successfully installed and will be added to the website.

Check Out Information and Photos of Completed or Ongoing Projects in the Boston Area & Throughout Massachusetts

From masonry restoration and facade repairs to building envelope repairs and concrete repairs, Elmwood Construction has the experience and reputation to provide you with high-quality workmanship on all of our projects. We specialize in building facade restoration in stone, brick and concrete surfaces. Restoring the exterior of brownstones throughout Boston to commercial masonry repair of large buildings is truly what we are passionate about.


Call  to schedule an appointment. References and additional sample projects are available upon request.


To read some of our client recommendations, please visit our 'Clients' page. 

60 Pleasant Street in Arlington, MA

  • Replaced deteriorating balcony decks
  • Replaced new with powder coated aluminum decks
  • Made by Wahoo Decks 

12-14 James Street Brookline, MA

  • 100% cut out and re-pointed the front elevation.
  • Replaced lentil sills
  • Replaced decorative stonework above portico roof front entrance

40 Highland Ave in Sommerville, MA

  • Re-pointed stairs 
  • Repaired stairs

100 Center Street in Brookline, MA

(Hebrew Center for Senior Living)

  • Removed all old sealant and backing rod in control joints and all windows
  • Grinded and prepped joints
  • Installed new backing rod and sealant

100 Marion Street Brookline, MA

  • Grinded and removed old sealant
  • Carried out repairs then coated entire deck with Vulkem Deck Coating
  • Installed all new railings

123 St Botholb Street South End Boston, MA

  • Cut out and re-pointed new 100% front and rear elevation

156- 154 Newbury Street Boston

(Rear of Building)

  • 100% cut out and re-pointing work

857 Beacon Street Boston, MA

  • Carried out extensive repairs to two large metal bays
  • Applied primer and paint
  • Carried out masonry re-pointing work on rear and side alley elevation of building

Dartmouth Street South End Boston

  • Replaced slate mansard roof new
  • Removed paint from brickwork
  • Re-pointed front elevation

Dartmouth Street Patio Repair Boston, MA

  • This patio is above parking garage
  • We removed existing brickwork
  • Installed waterproofing membrane and new copper flashing and installed new brick

123 South Street Leather District Boston, MA

  • Carried out extensive masonry repairs to front elevation
  • 100% cut out and re-pointed new

108 Lincoln Street Leather District Boston, MA

  • Carried out partial masonry repairs
  • Re-pointed work to building
Re-pointed work to building

179 South Street Leather District Boston, MA

  • Carried out extensive metal work repair to first and second
  • Re-pointed work to building
Re-pointed work to building

341 Marlboro Street Back Bay Boston, MA

  • Carried out brownstone restoration work to entire elevation

42 Chauncy Street Boston, MA

  • There were never window openings in the building
  • Saw cut opened all window openings and installed new windows

90 South Street Leather District Boston

  • This building was in terrible condition
  • All stone and brick work were almost completely black
  • After numerous attempts, we managed to get all the stains and dirt removed and back to its original color
  • We 100% cut out and re-pointed entire elevation
  • Replaced all damage brick new
  • Completely restored entire front metal stairs 
  • Surrounding metal work on the bottom two floors

107 South Street and Tufts Street Boston Leather District

  • Removed existing vaulted sidewalks
  • Installed new steel decking and rebar
  • Poured new concrete sidewalks

234 Clarendon Street Back Bay

  • Carried out extensive repairs to the front elevation and the inside of parapet walls
  • Replaced new rotted wood moldings around windows and coated the inside of parapet wall with Conproco Lastic

Washington Street Downtown Crossing

  • Carried out extensive masonry restoration to the front elevation
  • Casted and replaced a lot of decorative stonework
  • 100% cut out and re-pointed and replaced all exterior window moldings

753 Atlantic Ave Boston

  • 100% re-pointed this elevation
  • Installed all new sealant on windows
  • Installed all new copper gutter and downspouts

The Foundry Building

320 West Second Street South Boston

  • 100% cut out and re-pointed rear elevation
  • Carried out extensive masonry concrete repairs
  • Waterproofed entire elevation

1 Delpond Drive Canton

(Hebrew Center for Senior Living)

  • Replaced new cracked sidewalk sections
  • Applied all new sealant and back rod between granite curb and sidewalk and all expansion joints

The Meadows at Marlboro, Massachusetts

  • Repairs that were carried out on concrete balconies at a large condo building belonging to home properties

486-488 Beacon Street Boston

  • Masonry re-pointing work, window lentils and sill replacement

1550 Beacon Street, Brookline

(The Hebrew Center for Senior Living)

  • Parking garage overhead beam repairs

1780 Beacon Street, Boston, Massachusetts

  • Large chimney repair, work carried out with crane and man lift

Brown Street in Brookline, Massachusetts

  • 100% cut out and re-pointing work, and replacement of lentils and sills

1550 Beacon Street, Brookline

(Hebrew Center for Senior Living)

  • Exterior masonry repairs

1550 Beacon Street, Brookline

(Hebrew Center for Senior Living)

  • Waterproofing foundation work

1550 Beacon Street, Brookline

(Hebrew Center for Senior Living)

  • Enclose section of parking garage

1550 Beacon Street, Brookline

(Hebrew Center for Senior Living)

  • Parking garage epoxy floor coating

234 Clarendon Street, Boston

  • Exterior masonry repairs and mansard roof replacement in Boston

172 Newbury Street, Boston

  • Copper work

Bunker Hill Condo

  • Foundation and excavation work

Quaker Valley, West Warwick, Rhode Island

  • Wrap around balcony repairs on four floors then applied epoxy coating

Jack Slater Building, Revere Beach, Revere

  • Exterior masonry repairs 